Pay in 4 interest-free payments of $44.99 Learn more
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Aug 8 - Aug 13
Pay in 4 interest-free payments of $44.99 Learn more
Ships within 48 hours · Estimated delivery Aug 8 - Aug 13
carried to the rescue site by a caterpillar tracked trolley and is normally transported to the danger zone in Thunderbird 2’s Pod 5
RUNNING NUMBER 25904
MAINS CABLE LENGTH 1m
needed to be rotated for return journeys
Following the purchase of the PGA wagons by DB Schenker
RT-CBD80-SE-A Clayton Class 18 / CBD80 Sellafield Ltd Hybrid Battery Diesel Locomotive No.1 (Version A) Water carried to the rescue siteRevolution Trains have announced they are producing the new Clayton Engineering Class 18 CBD80 CBD90 hybrid battery diesel shunting locomotive in OO gauge. Models are available to pre order exclusively from Rails! Expected Delivery Q3 Q4 2026 (Subject to Change at Manufacturer's Discretion). This model is the CBD80 Sellafield Ltd locomotive. There are two versions of this locomotive available to pre order. They are the same locomotive with different
US$ 775.00
US$ 52.47
US$ 827.50
US$ 661.50
US$ 52.46
US$ 858.00
US$ 35.97
US$ 55.97
US$ 621.00
US$ 775.00
US$ 489.00
US$ 35.97
US$ 645.00
US$ 421.00
US$ 775.00
US$ 755.50